RAILROAD SIGNALS of the U.S.

PICTURES of
the
BALTIMORE LIGHT RAIL SYSTEM

A southbound "2 pack" running alongside Howard St, stopped at the Convention
Center.
The Bromo-Seltzer tower is in the background, and Camden station
is behind me to my left.
The tracks just left the middle of Howard St in
the background.
Hunt Valley and Cockeysville
SB rounding the curve heading into Pepper Rd.
SB coming up the short grade from Shawan Rd in
Hunt Valley.
NB at Beaver Dam Rd, Warren Rd to the right of us
- Cockeysville.
SB climbing small grade in order to cross Warren
Rd.
Two destinations you can't find on the map, or go
to. Ten years ago when I worked in railcar maintenance, I programmed these
two destinations, Ruxton and Riderwood, into the ODK. I'm surprised they
are still there today. If you get to Baltimore and want them displayed,
ask the operator for destination 198. Most of them, if not all of them,
don't even know the code exists. These pictures were taken at the BWI
station on 11-2-05.
A couple of contractors checking out the vital relays at Warren Rd before the Hunt Valley extension was placed into service.
Here are a few shots from around the system, a lot of which were taken during the years 1995-1998 when I worked in railcar maintenance.
Night time wire work in the yard at
North Avenue, ~1997.
Southbound approach signals coming into
North Ave, ~1997.

Shots from grand opening day of the Hunt Valley extension.

805 pulling a 3-pack at Warren Rd to test the
catenary for alignment before energizing and revenue service.
First time 805 went down Howard St, I guess they
didn't believe the thing would clear the street, why else would everyone be
looking at it? The other picture is 805 sitting in the North Ave yard,
along with 804.

Two different Conrail freights waiting to go back to Bayview
yard after having spent the night running up the Light Rail to Timonium during
the off hours between 0130 and 0430. If the freight can't make it back in
time for the start of revenue service, they will park it on the siding at Warren
Rd in Cockeysville. Once in a great while when we were doing brake rate
tests in Timonium, We would have to "chill" while waiting for the freight to
pass us. The 28th St bridge is in the background, and the steps lead down
to the Relief Point, where they exchange operators.
Here's a shot from the North Ave bridge, that
goes over the Light Rail (and the CSX mainline), the shops are in the
background. You can great shots of freights coming from Philly just a few
feet away, and they're on a curved girder trestle.
A busy construction photo of the interlocking for
the small branch going into Penn Station. Howard St bridge is in the
background.
Ooooops, not sure if the truck or 5017 won
this one on a Saturday night back in 1997 on Howard St.
An MTA cop protecting the Warren Rd crossing
while maintainers work on the gates.
A NB train at Lake Roland / Robert E. Lee
park.
A view of a train on 3S from the 4S
maintenance platform.
A couple of busses at Camden Station.
Yours truly getting a Customer Service award
in 1995. Also in the photo on the left is John Agro, who was head of the
MTA back in those days, and George Thompson on the right, a foreman at the time,
later promoted to Superintendent... he came from the Heavy Rail side around
1994.
Track 3 being extended out of the carbarn on
the north side, to join the tail track around the 1996 timeframe.
Construction Photos - North End Double Tracking Project

Three shots of LRV's finally back on the
mainline, testing the tracks, catenary, and signals. Sunday
11-6-05.
Construction photos from the double tracking
at Timonium stop by the Fairgrounds. The two left photos are looking
north, the one on the right is looking south.
Created 09/2005
Last Modified On:
Monday, 24 January 2011